AQHI, Inc. has successfully completed over 50,000 projects removing asbestos, mold, lead and PCB's from a variety of facilities, ranging from single-family residences to large apartment complexes and entire school districts.


The Meadows Apartments - Culver City, CA

An apartment complex with hundreds of units spread over 19 buildings.

In order for the property owner to install a new roof system, AQHI, Inc. removed over 300,000 square feet of asbestos-containing composition roofing membrane from the entire occupied complex.


Rialto Unified School District - Rialto, CA

District-wide facilities, including 24 elementary, middle school and high school campuses.

As part of a district-wide modernization project, AQHI, Inc. removed asbestos-containing floor tile, roofing, window putty and heater insulation from over 150 classroom buildings while school was in session.


Red Hill Country Club - Rancho Cucamonga, CA

A private, widely-known country club.

Prior to demolition of the existing clubhouse complex, AQHI, Inc. removed asbestos-containing floor tile, roof mastic and pipe insulation.


Huntington Pier Colony Condominiums - Huntington Beach, CA

A multi-story 200 unit condominium complex.

As a result of a construction building defect, showers and bathtubs leaked, causing mold to develop between floors, contaminating individually owned adjacent units. AQHI, Inc. removed mold-infested drywall from ceilings and walls, then removed mold from surfaces of structural beams between floors.


McHugh Apartment Building - Los Angeles, CA

An 8-unit apartment building.

After the front facade of the building collapsed and fell to the street below, AQHI, Inc. worked through the night to remove asbestos-contaminated debris in order to re-open the street. After the initial emergency was resolved, AQHI, Inc. removed the balance of asbestos-containing materials from the building, including siding, roofing and floor tile, so the building could be demolished before it collapsed.


Hilton Hotel - San Bernardino, CA

A 250 room luxury hotel.

As part of a major renovation project, AQHI, Inc. removed asbestos-containing ceiling tiles and asbestos-containing acoustic ceiling spray from hallways and corridors throughout the occupied hotel.


Russell Residence - Laguna Beach, CA

A privately owned 8,000 square foot residence.

After a fire nearly destroyed the house, AQHI, Inc. cleared out the charred asbestos-containing debris, then removed all remaining asbestos-containing floor coverings, drywall and insulation, as well as cabinets and fixtures, resulting in a clean concrete floor, wood studded re-build project.


Victoria Bridge - Riverside, CA

A historical, concrete vehicle and pedestrian bridge.

AQHI, Inc. scraped lead-based paint from over 5,000 square feet of surface area of the pedestrian walkway area.