AQHI, Inc. has successfully completed over 50,000 projects removing asbestos, mold, lead and PCB's from a variety of facilities, ranging from single-family residences to large apartment complexes and entire school districts.
The Meadows Apartments - Culver City, CA
An apartment complex with hundreds of units spread over 19 buildings.
In order for the property owner to install a new roof system, AQHI, Inc. removed over 300,000 square feet of asbestos-containing composition roofing membrane from the entire occupied complex.
Rialto Unified School District - Rialto, CA
District-wide facilities, including 24 elementary, middle school and high school campuses.
As part of a district-wide modernization project, AQHI, Inc. removed asbestos-containing floor tile, roofing, window putty and heater insulation from over 150 classroom buildings while school was in session.
Red Hill Country Club - Rancho Cucamonga, CA
A private, widely-known country club.
Prior to demolition of the existing clubhouse complex, AQHI, Inc. removed asbestos-containing floor tile, roof mastic and pipe insulation.
Huntington Pier Colony Condominiums - Huntington Beach, CA
A multi-story 200 unit condominium complex.
As a result of a construction building defect, showers and bathtubs leaked, causing mold to develop between floors, contaminating individually owned adjacent units. AQHI, Inc. removed mold-infested drywall from ceilings and walls, then removed mold from surfaces of structural beams between floors.
McHugh Apartment Building - Los Angeles, CA
An 8-unit apartment building.
After the front facade of the building collapsed and fell to the street below, AQHI, Inc. worked through the night to remove asbestos-contaminated debris in order to re-open the street. After the initial emergency was resolved, AQHI, Inc. removed the balance of asbestos-containing materials from the building, including siding, roofing and floor tile, so the building could be demolished before it collapsed.
Hilton Hotel - San Bernardino, CA
A 250 room luxury hotel.
As part of a major renovation project, AQHI, Inc. removed asbestos-containing ceiling tiles and asbestos-containing acoustic ceiling spray from hallways and corridors throughout the occupied hotel.
Russell Residence - Laguna Beach, CA
A privately owned 8,000 square foot residence.
After a fire nearly destroyed the house, AQHI, Inc. cleared out the charred asbestos-containing debris, then removed all remaining asbestos-containing floor coverings, drywall and insulation, as well as cabinets and fixtures, resulting in a clean concrete floor, wood studded re-build project.
Victoria Bridge - Riverside, CA
A historical, concrete vehicle and pedestrian bridge.
AQHI, Inc. scraped lead-based paint from over 5,000 square feet of surface area of the pedestrian walkway area.
|